Just a sample of the Echomail archive
Cooperative anarchy at its finest, still active today. Darkrealms is the Zone 1 Hub.
|    RAILFAN    |    Trains, model railroading hobby    |    3,261 messages    |
[   << oldest   |   < older   |   list   |   newer >   |   newest >>   ]
|    Message 2,042 of 3,261    |
|    Stephen Sprunk to hancock4@bbs.cpcn.com    |
|    Re: Home signal--flashing green over red    |
|    10 Jan 16 15:06:22    |
      From: stephen@sprunk.org              On 10-Jan-16 12:36, hancock4@bbs.cpcn.com wrote:       > Stephen Sprunk wrote:       >> One of the things that's frustrating about Amtrak is that they tie       >> numerous projects together into one mega-project, then complain they       >> don't have the funding and do nothing, whereas they _do_ have funding       >> for one project at a time, and its benefits would fund the rest.       >       > Could you elaborate on some examples of the above? Thanks.              The first that comes to mind is constant-tension catenary, switching to       2x25kV, switching to 60Hz, and upgrading to 150mph+. Any of those could       be done independently, and at least two of them would save enough money       to pay for the other(s) later.              The result is that most of Amtrak's trackage is still on       variable-tension at 11kV 25Hz at 125/135mph, aside from the       newly-electrified section in RI/MA and (recently) one short section in       NJ. In contrast, MNRR long ago upgraded their trackage to       constant-tension at 2x12.5kV 60Hz, so it's not like Amtrak could think       it's impossible.              S              --       Stephen Sprunk "God does not play dice." --Albert Einstein       CCIE #3723 "God is an inveterate gambler, and He throws the       K5SSS dice at every possible opportunity." --Stephen Hawking              --- SoupGate/W32 v1.03        * Origin: LiveWire BBS -=*=- UseNet FTN Gateway (1:2320/1)    |
[   << oldest   |   < older   |   list   |   newer >   |   newest >>   ]
(c) 1994, bbs@darkrealms.ca